13 November 2026 | Inspection on 12 November. Paraguay's MOPC reported 64% completion of works to channel and restore the San Lorenzo stream. The intervention includes 850 metres of channel infrastructure intended to improve stormwater drainage and reduce flooding risk. The ministry estimates that roughly 15,000 residents could benefit. This is a projection, not a verified count of people already protected.
Remaining construction
During the minister's inspection, crews were preparing the channel's base slab for a planned concrete pour. The project was still underway, so full operational effectiveness cannot be assumed. Avoided flood losses or property-value effects have not been independently established.
Radar Analysis
Urban drainage matters for business continuity, road maintenance and risk reduction. Results should be assessed after significant rainfall using documented flood incidents and completed works, not inferred from a percentage of construction alone.